Tesla Model Y: How much does it cost to recharge the electric SUV?

This page is translated from the original post "Tesla Model Y : combien coûte la recharge du SUV électrique ?" in French.

Comment
Tesla Model Y Supercharger recharge

The Tesla Model Y is now the best-selling electric vehicle in France, surpassing another Tesla, the Model 3. With its more affordable price compared to the latter and a more competitive rate, it has all the makings of a blockbuster. But what about its charging costs?

The Tesla Model Y has succeeded in its gamble by putting the compact SUV at the forefront of the American manufacturer’s offerings. Largely based on the Tesla Model 3, it is nevertheless longer by 6 cm (4.75 m long), wider (1.92 m), and notably taller (1.62 m). As we can see, the SUV architecture is far from having said its last word. For now, the Tesla Model Y is available in three versions: Model Y Rear-Wheel Drive (Top speed of 217 km/h, 0 to 100 km/h in 6.9 seconds and 49,990 € before a 5,000 € bonus in 2023); Model Y Long Range (Top speed of 217 km/h, 0 to 100 km/h in 5 seconds and 64,990 €); Model Y Performance (Top speed of 250 km/h, 0 to 100 km/h in 3.7 seconds and 69,990 €).

Range and consumption of the Tesla Model Y Long Range

Measured consumption
Highway14 kWh/100 km
Motorway19 kWh/100 km
City16 kWh/100 km
Mixed cycle16 kWh/100 km
Measured range
Highway500 km
Motorway370 km
City460 km
Mixed cycle450 km
Range and consumption of the Tesla Model Y

Charging Time for the Tesla Model Y Long Range

Max AC charging power (0%-100%)11 kW
Charging time with 2.3 kW30 hours
Charging time with 7.4 kW13 hours
Charging time with 11 kW9 hours
Max DC charging power (20%-100%)250 kW
Charging time at 100 kW50 minutes
Charging time at 250 kW39 minutes
Charging time for the Tesla Model Y

Home charging of the Tesla Model Y Long Range

Net battery capacityOff-peak rate*Peak rate**Cost of 100% charge
approx. 75 kWh0.112 €/kWh0.185 €/kWhfrom €8.4* to €13.88**
*off-peak hours, **peak hours

Fast charging on Ionity station for the Tesla Model Y Long Range

Battery capacityPricing*Cost of 100% charge
approx. 75 kWh0.39 €/kWh29.25 €
*excluding subscription

Ultra-fast charging with a Tesla Supercharger

Battery capacityPricing*Cost of 100% charge
approx. 75 kWh0.59 €/kWh to 0.66 €/kWhfrom €44 to €49.5
*excluding subscription

Charging on Belib’ station (Paris) for the Tesla Model Y Long Range

Boost+ 50 kW charging durationCost €4.40 / 15 min
1h30€26.40*
*excluding commission

Also read: Tesla Model Y: review of the most family-oriented Tesla

We also suggestthese articles:

Recharge

Charging as fast as filling up a tank… on paper

Recent articles